Fairing, Day 542: Slower than Christmas

›
Merry Christmas to you! Fairing work on my Glen-L Zip seems to be taking forever. But then again, I haven't been pushing to finish thi...
1 comment:
Saturday, November 23, 2019

Fairing, Day 510: Port bottom slowly taking shape

›
The last 14 days have brought about quite a bit of work on the floor battens and the chine around Frame #4.  To a lesser degree, I...
Saturday, November 9, 2019

Fairing, Day 496: Frame #4 essentially done

›
Day 496; a Saturday. We've reached another minuscule milestone in the fairing.  The bottom of Frame #4 is, for all intents and purpose...
Tuesday, November 5, 2019

Fairing, Day 492: The Life Span of a Lowly Shim

›
Day 492. Still working on the port side of Frame #4. To a lesser degree, I'm still working to flatten that high area on the keel. Slow...
Friday, November 1, 2019

Fairing Diary, Day 488: All Saints Day

›
Day 488. Happy All Saints Day. Now, where were we? Let's take a look at that keel: If we put a 6-foot level on the port side of the...
Monday, October 28, 2019

Fairing, Day 484: Tribulations of a Transom

›
Finally... another minuscule milestone along our far-flung foray into fairing. I've finally got the port side of the transom even with...
›