Building a 1953-designed Glen-L Utility and a 1954-designed Glen-L Zip.
Monday, September 28, 2015
Back to work
With the successful launch of Perseverance last weekend at G9behind me, it's time to get back to work on getting the little boat finished. Yesterday, I applied the 2nd coat of epoxy to the center third of the interior, as well as the remaining length of the sheers. This area is now ready to be painted.
This area between frames #1 and #2 is ready to be painted.
The aft third of the interior still needs a 2nd coat of epoxy.
No comments:
Post a Comment