I made this little chart to help explain what I've been working on.
In a nutshell, I have mostly been working in "zone 1." The floor battens are basically fair with Frame #2 (located between the "1" and the "2" on the chart). This has created a low spot in the 3 floor battens on that side of the keel, as well as the keel itself.
The battens are basically even with the transom, but everything from the transom forward to Frame #2 needs to be lowered to meet Frame #2. I'm doing this mostly by hand sanding, now that the rough work has been done with the belt sander.
Transom, floor battens, and keel. |
Initial tapering at the front of the keel. |
No comments:
Post a Comment