Michael's Boatbuilding Blog
Building a 1953-designed Glen-L Utility and a 1954-designed Glen-L Zip.
Friday, April 26, 2019
Fairing around the Zip's stem
Here are a few progress photos that show the current state of fairing work on the starboard side of the stem, as well as the chine & frame #5-1/2.
The mostly un-faired port side, compared to the faired starboard side.
The mostly un-faired port side, compared to the faired starboard side.
It's coming along... slowly.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment