Michael's Boatbuilding Blog
Building a 1953-designed Glen-L Utility and a 1954-designed Glen-L Zip.
Friday, October 18, 2013
The Utility: Progress on the 2nd set of chine strips
Fairing these additional chine strips is coming along pretty quickly. Here are a couple of iPhone shots to show progress on the starboard side.
Faired flush with the side of frame #1.
A little more work is needed to blend the ends into the curvature of the chine. It's getting close, though.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment