Tuesday, November 29, 2016

The Slow Saga of Zip Frame #4 — part three

The long holiday weekend proved to be fruitful in my cramped little boat shop. After a little sanding, I started drawing out some frame gussets. Next thing you know, I had 3/4 of the frame assembled.

Floor beam, after sanding the laminated strips to shape.

Floor beam and one of the side pieces.

Drawing out frame gussets on scrap pieces of plywood.

Next thing you know, the gussets were cut, sanded, and screwed onto the frame.

Starboard side detail.

Port side detail.

No comments:

Post a Comment